SWMS generator

AI-drafted SWMS, ready for sign-off.

Describe the job by voice or text. StandardsMate™ identifies the hazards, recommends the controls and drafts a Safe Work Method Statement laid out the way the WHS Regulations ask. You check it against the job, your crew signs it, and you export it, in minutes instead of the hour a paper template costs you.

Try the SWMS generator free

The free plan covers one SWMS a month. Pro and Business plans run unlimited.

How a SWMS gets built

From one sentence to a signed SWMS.

One SWMS all the way through: the ceiling rough-in above the stair void, on the Upstairs reno job.

  1. Say or type the work, and add up to five files: site photos, or a drawing as a PDF. StandardsMate drafts the SWMS from it.

    “start a swms for the upstairs rough-in over the stair void”

  2. Each hazard is rated before and after its controls, worked down the hierarchy: here two start High and one Medium, and all three end Low. You check the draft against the site and change what does not fit.

  3. Publishing locks version 1.0, so everyone signs the same thing. The crew scan the QR on site, you text or email the link from your phone’s share sheet, or you hand your phone to each worker with Sign on this phone.

  4. Each worker scans the QR, opens the link or signs on your phone, reads the SWMS and signs with a finger. No account needed.

  5. Publishing files the PDF with the job and logs it there. Change the work later and publish again, and the crew sign the new version.

Stop filling out SWMS by hand.

The free plan includes one SWMS document a month. Pro and Business plans include unlimited SWMS generation with voice input and e-signatures.

Get started free

What is a SWMS

The document the law asks for before high risk work starts.

A Safe Work Method Statement is the document the Work Health and Safety Regulations require for high risk construction work (HRCW) in Australia. It identifies hazards, assesses risks, and documents the control measures used to carry out the work safely.

Under the WHS Regulations, a PCBU must ensure HRCW is not carried out unless a SWMS is in place and signed by the workers involved. This applies across all states and territories, with specific requirements varying by jurisdiction.

Common tasks that require a SWMS: working at heights above 2 metres, electrical work near live conductors, demolition, confined space entry, working near traffic, and excavation deeper than 1.5 metres.

When is a SWMS required?

A SWMS is not optional paperwork. Under the WHS Regulations, high risk construction work cannot legally start until a SWMS is in place. High risk construction work is a defined list: if the task is on it, the obligation is automatic, and a regulator or principal contractor can stop the job if no SWMS exists.

The categories that require a SWMS include, among others:

  • A risk of a person falling more than two metres
  • Work on or near energised electrical installations
  • Work in or near a confined space
  • Demolition, or the disturbance of asbestos
  • Work in a trench or excavation deeper than 1.5 metres
  • Work near powered mobile plant, traffic or pressurised services

Not sure whether a task counts? That is the question to settle before the job starts: getting it wrong means the work was never compliant. The full guide to Safe Work Method Statements covers what a compliant SWMS must contain, who can prepare it, and how state rules differ.

What a compliant SWMS contains

Four things every SWMS has to do.

The WHS Regulations set the minimum. A document missing any one of these is not a compliant SWMS. StandardsMate lays out every draft to cover all four, and you fill in and check the details for your job.

Identify the work
State the high risk construction work being done, where it happens on site and the activities it covers.
Identify the hazards
Name the health and safety hazards the work creates, and the risks to the workers carrying it out.
Set the control measures
Describe the controls that remove or reduce each risk, worked down the hierarchy of controls.
Show how controls are run
Describe how the controls are put in place, monitored on site and reviewed if the work changes.